Mooring the units

 

The principle of the system:

 

The pipe-buoyancy is calculated only for biomass. To absorb active forces mooring-buoys are fixed on the anchor-ropes. Mooring and handling is easily done. The complete unit leaves only 2 shackles to connect into the mooring-system.

Mooring on strong-tidal sites or open-water sites:

Single mooring of one or more units in the length having an anchor and mooring buoy in each end.

Mooring on sheltered sites:

Prefabricated fans and spread-ropes may be set up as a mooring-system to reduce the number of anchoring points.
Or several Units linked together and anchored in each end.

© 2010 ateljedigital.se